subject
Mathematics, 19.10.2021 14:10 kookycookiefanx

9. A bicycle shop sells road bikes and town cruisers. It takes 2 hours to assemble a road bike. It takes 1 hour to assemble a town cruiser. A maximum of 60 hours a week is set aside to complete the assembly for both types of bike. After assembly, for safety reasons the assembly needs to be checked and tested. It takes - hour 2 to check and test the road bikes, and - hour to check and test the town cruisers. A maximum of 20 hours per week is set aside to complete these tasks for both types of bike. a. What is a system of inequalities that models this scenario? A b. What is the graph of the solution to this system?

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 15:30
Is each relation a function? if so, state whether it is one-to-one or many-to-one. 3. (-4,7), (-3,5), (1,4), (3,-8), (5,-11) 4. (-4,8), (-2,4), (0,1), (2,4), (4,8) 5. (-2, 1), (-2,3), (0,-3), (1,4), (3,1)
Answers: 3
question
Mathematics, 21.06.2019 21:20
What is the area of a triangle with vertices at (-3 3) (-3,2) and (1,2)?
Answers: 1
question
Mathematics, 22.06.2019 00:00
Find the distance between the point (-3,-4), and (see the picture below)
Answers: 1
question
Mathematics, 22.06.2019 00:00
Asunflower was 20 1/2 inches tall. over the next 6 months, it grew to a height of 37 inches tall. what was the average yearly growth rate of the height of the sunflower? ? plz write a proportion to solve i will give you 100 points
Answers: 2
You know the right answer?
9. A bicycle shop sells road bikes and town cruisers. It takes 2 hours to assemble a road bike. It t...
Questions
question
Mathematics, 20.09.2020 02:01
question
English, 20.09.2020 02:01
question
Mathematics, 20.09.2020 02:01
question
Geography, 20.09.2020 02:01
Questions on the website: 13722363