subject
Mathematics, 20.10.2021 01:40 shires24

Estions Problem 14-25 Algo (Strategies for Aggregate Production Planning)

The forecasted demand for fudge for the next four months is 280, 220, 240, and 300 pounds.

a. What is the recommended production rate if a level strategy is adopted with no backorders or stockouts? What is the endin

Round your answers to the nearest whole number.

.

ОО

.

Production rate:

pounds/month

5.

Ending inventory (month 4):

pounds

b. What is the level production rate with no ending inventory in month 4? Round your answer to one decimal place.

Production rate:

pounds/month

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 18:30
The formula for the lateral area of a right cone is la = rs, where r is the radius of the base and s is the slant height of the cone.which are equivalent equations?
Answers: 3
question
Mathematics, 21.06.2019 19:30
James was playing a game with his friends. he won 35 points. then he lost 15, lost 40 and won 55. how did he come out
Answers: 2
question
Mathematics, 21.06.2019 20:00
In one day there are too high tides into low tides and equally spaced intervals the high tide is observed to be 6 feet above the average sea level after six hours passed a low tide occurs at 6 feet below the average sea level in this task you will model this occurrence using a trigonometric function by using x as a measurement of time assume the first high tide occurs at x=0. a. what are the independent and dependent variables? b. determine these key features of the function that models the tide: 1.amplitude 2.period 3.frequency 4.midline 5.vertical shift 6.phase shift c. create a trigonometric function that models the ocean tide for a period of 12 hours. d.what is the height of the tide after 93 hours?
Answers: 1
question
Mathematics, 21.06.2019 20:30
Aswimming pool measures 22ft by 12ft and is 4ft deep. if the pool is being filled at 2.5 cubic ft per minute, how long will it take to fill the pool?
Answers: 1
You know the right answer?
Estions Problem 14-25 Algo (Strategies for Aggregate Production Planning)

The forecast...
Questions
question
English, 13.07.2019 04:30
question
English, 13.07.2019 04:30
Questions on the website: 13722360