subject
Mathematics, 24.10.2021 19:50 symaria

Company A needs 110 days to rebuild a bridge. Company B needs 150 days to rebuild the same bridge. Working together, they can do the job in d days. Which equation can be used to find the value of d?

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 22.06.2019 01:50
Write the point-slope form of an equation of the line through the points (-2, -3) and (-7, 4).
Answers: 1
question
Mathematics, 22.06.2019 02:30
What are the factors of me - 12m + 20?
Answers: 1
question
Mathematics, 22.06.2019 02:30
The center on a target has a diameter of 5 inches. the whole target has a diameter of 25 inches. complete the explanation for what part of the whole target is the center. the center of the target takes up % of the whole target.
Answers: 3
question
Mathematics, 22.06.2019 03:00
A. find the power of the test, when the null hypothesis assumes a population mean of mu = 450, with a population standard deviation of 156, the sample size is 5 and the true mean is 638.47 with confidence intervals of 95 b. find the power of the test, when the null hypothesis assumes a population mean of mu = 644, with a population standard deviation of 174, the sample size is 3 and the true mean is 744.04 with confidence intervals of 95% c. find the power of the test, when the null hypothesis assumes a population mean of mu = 510, with a population standard deviation of 126, the sample size is 10 and the true mean is 529.44 with confidence intervals of 95
Answers: 2
You know the right answer?
Company A needs 110 days to rebuild a bridge. Company B needs 150 days to rebuild the same bridge. W...
Questions
question
Mathematics, 21.01.2021 19:10
question
Mathematics, 21.01.2021 19:10
question
Mathematics, 21.01.2021 19:10
question
Mathematics, 21.01.2021 19:10
question
English, 21.01.2021 19:10
question
English, 21.01.2021 19:10
question
Mathematics, 21.01.2021 19:10
Questions on the website: 13722359