A concrete piece requires 43.8 cubic meters (m3) of concrete. Use the fact that 1 yard is approximately equal to 0.9144 m to convert this volume to cubic yards (yd3). Round your answer to the nearest hundredth. Do not type the units in the space below.

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 15:30
20 only answer if 100% sure most high school-aged teens are very active. a. true b. false
Answers: 2
question
Mathematics, 21.06.2019 16:30
What is the order of magnitude for the number of liters in a large bottle of soda served at a party
Answers: 2
question
Mathematics, 21.06.2019 18:10
Television sizes are based on the length of the diagonal of the television's rectangular screen. so, for example, a 70-inch television is a television having a diagonal screen length of 70 inches. if a 70 inch television's diagonal forms a 29°angle with the base of the screen, what is the vertical height (1) of the screen to the nearest inch? 70 inhin
Answers: 3
question
Mathematics, 21.06.2019 19:00
The width of a rectangle is 20 units. can the perimeter p of the rectangle be 64 units when its length x is 11 units? no, because p = 2x + 2(20) no, because p ≠ 2x + 2(20) yes, because p ≠ 2x + 2(20) yes, because p = 2x + 2(20)
Answers: 1
You know the right answer?
A concrete piece requires 43.8 cubic meters (m3) of concrete. Use the fact that 1 yard is approximat...
Questions
Questions on the website: 13722359