Three different methods for assembling a product were proposed by an industrial engineer. To investigate the number of units assembled correctly with each method, 30 employees were randomly selected and randomly assigned to the three proposed methods in such a way that each method was used by 10 workers. The number of units assembled correctly was recorded, and the analysis of variance procedure was applied to the resulting data set. The following results were obtained: SST = 10,800; SSTR = 4560. a. Set up the ANOVA table for this problem (to 2 decimals, if necessary).
Source of Variation Sum of Squares Degrees of Freedom Mean Square F
Treatments
4560
2
2280
9.87
Error
6240
27
231.11
Total
10800
29
b. Use α = .05 to test for any significant difference in the means for the three assembly methods.
Calculate the value of the test statistic (to 2 decimals).
9.87
The p-value is
less than .01
What is your conclusion?
Conclude not all means of the three assembly methods are equal
are my calculations correct?

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 16:00
12. the amount of money in a bank account decreased by 21.5% over the last year. if the amount of money at the beginning of the year is represented by ‘n', write 3 equivalent expressions to represent the amount of money in the bank account after the decrease?
Answers: 2
question
Mathematics, 21.06.2019 17:40
Which number produces a rationale number when multiplied by 1/5
Answers: 1
question
Mathematics, 21.06.2019 19:00
Acompany manufactures large valves, packed in boxes. a shipment consists of 1500 valves packed in 75 boxes. each box has the outer dimensions 1.2 x 0.8 x 1.6 m and the inner dimensions 1.19 x 0.79 x 1.59 m. the boxes are loaded on a vehicle (truck + trailer). the available capacity in the vehicle combination is 140 m3. each valve has a volume of 0.06 m3. - calculate the load factor on the box level (%). - calculate the load factor on the vehicle level (%). - calculate the overall load factor (%).
Answers: 1
question
Mathematics, 21.06.2019 22:30
My hour hand points between the 8 and the 9 in 35 minutes it will be the next hour. what time is it ?
Answers: 2
You know the right answer?
Three different methods for assembling a product were proposed by an industrial engineer. To investi...
Questions
question
Mathematics, 11.02.2021 02:30
question
Mathematics, 11.02.2021 02:30
question
Chemistry, 11.02.2021 02:30
question
Mathematics, 11.02.2021 02:30
Questions on the website: 13722363