subject
Mathematics, 02.12.2021 20:40 Maria3737

TP2. LO 4.4If a job order cost system tracks the direct materials and direct labor, why doesn’t it track the actual overhead used for a specific job?

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 19:30
Ascientist wants to use a model to present the results of his detailed scientific investigation. why would a model be useful? a )because the model makes the concepts easier to understand b) because the model is easy to put together and to use c) because the model prevents other scientists from asking questions d) because the model requires the audience to pay full attention to it i don't know what to choose because between a and d a is much more likely than d because it only wants to get the attention of the audience. i'm confuse.
Answers: 1
question
Mathematics, 21.06.2019 21:40
Scores on the cognitive scale of the bayley-scales of infant and toddler development range from 1 to 19, with a standard deviation of 3. calculate the margin of error in estimating the true mean cognitive scale score, with 99% confidence, if there are 12 infants and toddlers in a sample.
Answers: 3
question
Mathematics, 21.06.2019 22:50
Which linear inequality is represented by the graph?
Answers: 1
question
Mathematics, 21.06.2019 23:30
In a right triangle δabc, the length of leg ac = 5 ft and the hypotenuse ab = 13 ft. find: b the length of the angle bisector of angle ∠a.
Answers: 1
You know the right answer?
TP2. LO 4.4If a job order cost system tracks the direct materials and direct labor, why doesn’t it t...
Questions
Questions on the website: 13722367