Mathematics, 06.12.2021 04:30 claupatri120
To manufacture an automobile requires painting, drying, and polishing. Epsilon Motor Compary produces three types of cars, the Deita, the Beta, and the Sigma. Each
Delta requires 9 hours for painting, 2 hours for drying, and 5 hours for polishing. A Beta requires 33 hours for painting, & hours for drying, and 6 hours for polishing, and
a Sigma requires 4 hours for painting, 3 hours for drying, and 2 hours for polishing. If the company has 190 hours for painting, 66 hours for drying, and 54 hours for
polishing per month, how many of each type of car are produced?
G
The Epsilon Motor Company produces:
__ Deltas
__ Betas
__ Sigmas in a month
Answers: 2
Mathematics, 21.06.2019 17:00
Complete the equation of the line through (−10,3) and (−8,−8). use exact numbers.
Answers: 1
Mathematics, 21.06.2019 19:00
Graph g(x)=2cosx . use 3.14 for π . use the sine tool to graph the function. graph the function by plotting two points. the first point must be on the midline and closest to the origin. the second point must be a maximum or minimum value on the graph closest to the first point.
Answers: 1
Mathematics, 21.06.2019 20:00
Evaluate the discriminant of each equation. tell how many solutions each equation has and whether the solutions are real or imaginary. x^2 - 4x - 5 = 0
Answers: 2
Mathematics, 21.06.2019 22:30
What is the least common multiple for 6 and 8? what is the least common multiple for 4 and 12 ? what is the least common multiple for 11 and 12? what is the least common multiple for 3 and 6?
Answers: 1
To manufacture an automobile requires painting, drying, and polishing. Epsilon Motor Compary produce...
Social Studies, 30.07.2019 09:00
Business, 30.07.2019 09:00
English, 30.07.2019 09:00
Mathematics, 30.07.2019 09:00
History, 30.07.2019 09:00
Biology, 30.07.2019 09:00
History, 30.07.2019 09:00
Biology, 30.07.2019 09:00
Computers and Technology, 30.07.2019 09:00
Mathematics, 30.07.2019 09:00
Mathematics, 30.07.2019 09:00
Mathematics, 30.07.2019 09:00