subject
Mathematics, 20.12.2021 06:00 levy72

A special piece of equipment is used at a construction site to dig holes. A hole is dug to a depth of 3.25 feet when the equipment hits rock. The progress slows to 5/8 feet per hour of digging. The depth of the hole must be at least 11 1/2 feet by the end of the day to stay on schedule. What is the minimum amount of time the equipment must continue at its present rate to complete the hole on schedule? Select from the drop-down menus to correctly complete the statement.
The equipment requires at least 13 or 23 hours and 2/6/12/36 minutes to complete the hole on schedule.

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 18:40
What dimensions can créate more than one triangle ?
Answers: 1
question
Mathematics, 21.06.2019 19:00
The focus of parabola is (-4, -5), and its directrix is y= -1. fill in the missing terms and signs in parabolas equation in standard form
Answers: 1
question
Mathematics, 21.06.2019 21:50
What is the product? a-3/15a × 5/a-3
Answers: 1
question
Mathematics, 22.06.2019 01:30
Which of the following is an irrational number
Answers: 1
You know the right answer?
A special piece of equipment is used at a construction site to dig holes. A hole is dug to a depth o...
Questions
question
Mathematics, 22.07.2019 03:00
Questions on the website: 13722361