subject
Mathematics, 16.02.2022 09:20 austinwag123

This table shows the production possibility schedule for several toothpaste companies. Toothpaste company Large tubes Small tubes 1 Sparkling 100 per hour 200 per hour 2 Bright White 100 per hour 250 per hour 3 Fresh! 200 per hour 250 per hour 4 Mmmint 150 per hour 150 per hour Use the numbers to place the companies in order of greatest comparative advantage to least comparative advantage in producing small tubes of toothpaste. 2, 1, 3, 4 1, 2, 3, 4 4, 3, 1, 2 2, 1, 4, 3.

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 20.06.2019 18:04
What two consecutive odd integers have a sum of -28
Answers: 1
question
Mathematics, 21.06.2019 12:30
(01.04 mc) an ice sculpture is melting because of heat. assuming its height changes bynegative 5 over 32m every hour, what will be the change in height after 4 hours?
Answers: 2
question
Mathematics, 21.06.2019 13:30
Volume of a cylinder with a radius of 13 in and height of 30 in
Answers: 1
question
Mathematics, 21.06.2019 15:00
Ricardo ran the 400 meter race 3 times his fastest time was 54.3 seconds his slowest time was 56.1 seconds if his average time was 55.0 seconds what was his time for the third race
Answers: 2
You know the right answer?
This table shows the production possibility schedule for several toothpaste companies. Toothpaste co...
Questions
Questions on the website: 13722361