subject
Mathematics, 21.02.2022 06:30 ilovesummertime207

A company makes two products, A and B. Product A requires 12,5 hours of machining time and 30 minutes of finishing time per unit. Product B requires 10 hours of machining time and one hour of finishing time per unit. There are 10000 hours and 600 hours available for machining and finishing respectively. Severe material shortages for the two products will limit their production to a maximum of 700 units for product A and 400 units for product B per day. If x and y are the number of units of product A and B produced per day respectively, choose the system of inequalities that describes the process.

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 18:30
What is another way to express 36 +32
Answers: 1
question
Mathematics, 21.06.2019 18:50
If sr is 4.5cm and tr is 3cm, what is the measure in degrees of angle s?
Answers: 2
question
Mathematics, 21.06.2019 19:50
Prove (a) cosh2(x) − sinh2(x) = 1 and (b) 1 − tanh 2(x) = sech 2(x). solution (a) cosh2(x) − sinh2(x) = ex + e−x 2 2 − 2 = e2x + 2 + e−2x 4 − = 4 = . (b) we start with the identity proved in part (a): cosh2(x) − sinh2(x) = 1. if we divide both sides by cosh2(x), we get 1 − sinh2(x) cosh2(x) = 1 or 1 − tanh 2(x) = .
Answers: 3
question
Mathematics, 21.06.2019 20:10
Over which interval is the graph of f(x) = x2 + 5x + 6 increasing?
Answers: 1
You know the right answer?
A company makes two products, A and B. Product A requires 12,5 hours of machining time and 30 minute...
Questions
question
Business, 15.12.2019 07:31
Questions on the website: 13722361