subject
Mathematics, 17.07.2019 10:50 sharondacarruth7853

Plz! i will choose the brainliest answer if correct. at a construction site, workers are moving dirt from a pile to fill a hole. the function graphed models the volume of dirt, y, in cubic feet, remaining in the pile after x hours. what do the key features of the graph indicate in this situation? drag and drop the answers into the boxes. indicates that the entire pile of dirt will have been moved hours. option box: 0 6 75 450 x-intercept y-intercept slope

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 16:30
Divide the following fractions 3/4 ÷ 2/3 1/2 8/9 9/8 2
Answers: 2
question
Mathematics, 21.06.2019 19:00
2pointswhich of the following appear in the diagram below? check all that apply.d a. zcdeов. сеo c. aéo d. zdce
Answers: 1
question
Mathematics, 21.06.2019 19:40
Afactory makes propeller drive shafts for ships. a quality assurance engineer at the factory needs to estimate the true mean length of the shafts. she randomly selects four drive shafts made at the factory, measures their lengths, and finds their sample mean to be 1000 mm. the lengths are known to follow a normal distribution whose standard deviation is 2 mm. calculate a 95% confidence interval for the true mean length of the shafts. input your answers for the margin of error, lower bound, and upper bound.
Answers: 3
question
Mathematics, 21.06.2019 21:50
What is the rate for one gallon of gasoline
Answers: 3
You know the right answer?
Plz! i will choose the brainliest answer if correct. at a construction site, workers are moving dir...
Questions
question
Computers and Technology, 13.11.2020 02:40
question
English, 13.11.2020 02:40
question
Computers and Technology, 13.11.2020 02:40
question
Mathematics, 13.11.2020 02:40
Questions on the website: 13722367