subject
Mathematics, 25.07.2019 22:20 Ltik11900

All the members of a construction crew work at the same pace. four members of the crew, working together, are able to pour foundations in 32 hours. what is the constant of variation?

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 17:00
Pam buys a sleeve of ball bearings for her skateboard. each of the bearings is 1 1/5 inches wide. the sleeve is 9 3/5 inches long. how many ball bearings are in the sleeve? show your work.
Answers: 3
question
Mathematics, 21.06.2019 21:30
Aboard 60 in. long is cut two parts so that the longer piece is 5 times the shorter. what are the length of the two pieces?
Answers: 1
question
Mathematics, 21.06.2019 22:00
Billie holiday sells children's clothing for sara vaughn's toddler shop. baby blankets sell for $29.99 after a markup rate based on cost of 109%. find the cost and the markup.
Answers: 2
question
Mathematics, 21.06.2019 23:40
What is the equation, in point-slope form, of the line that has a slope of 6 and passes through the point (–1, –8)? a. y+8 = 6 (x+1 )
Answers: 1
You know the right answer?
All the members of a construction crew work at the same pace. four members of the crew, working toge...
Questions
question
Spanish, 17.12.2019 07:31
question
Biology, 17.12.2019 07:31
Questions on the website: 13722359