subject
Mathematics, 01.10.2019 06:30 eminim01

Mrs. solar modeled contractor 2’s fees with the formula y = 150 + 55x. mrs. solar compared
contractor 2’s fee to contractor 1’s fee.

(a) what does the difference between 50 and 55 mean in the real-world context?
(b) what does the difference between 200 and 150 mean in the real-world context?

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 18:00
If you had $1,900,000, how many days would it take you to spend all if you spent $1 a second. (there are 86,400 seconds in a day)
Answers: 1
question
Mathematics, 21.06.2019 23:40
For a science project, a high school research team conducted a survey of local air temperatures. based on the results of the survey, the found that the average temperatures were around 10 degrees higher than expected. this result was wrong. the trouble with the survey was that most of the locations were exposed to direct sunlight and located over asphalt or sand, which resulted in higher temperatures than normal. this is a classic example of an error in which phase of inferential statistics?
Answers: 1
question
Mathematics, 22.06.2019 05:30
What is the solution to the system of equations? 10x+3y=8 -9x-y=-20 (11, 1) (1, 11) (–1, 11) (11, –1)'
Answers: 1
question
Mathematics, 22.06.2019 09:00
The table and the graph below each show a different relationship between the same two variables, x and y: a table with two columns and 5 rows is shown. the column head for the left column is x, and the column head for the right column is y. the row entries in the table are 4,100 and 5,125 and 6,150 and 7,175. on the right of this table is a graph. the x-axis values are from 0 to 10 in increments of 2 for each grid line. the y-axis values on the graph are from 0 to 300 in increments of 60 for each grid line. a line passing through the ordered pairs 2, 60 and 4, 120 and 6, 180 and 8, 240 is drawn. how much more would the value of y be on the graph than its value in the table when x = 12? 20 30 60 70
Answers: 1
You know the right answer?
Mrs. solar modeled contractor 2’s fees with the formula y = 150 + 55x. mrs. solar compared
co...
Questions
Questions on the website: 13722367