subject
Mathematics, 03.08.2019 22:30 SavannahP04

One road crew can pave a section of highway in 15 h. a second crew can do the same job in 10h. how long would it take to pave that same section of highway if both crews worked together?

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 16:00
While scuba diving, rajeev dove to a depth of 12.6 feet below the surface of the water and then descended another 8.7 feet. what expression can be used to find rajeev's new position? 12.6 – 8.7 –12.6 – 8.7 –12.6 – (–8.7) 12.6 – (–8.7)
Answers: 2
question
Mathematics, 21.06.2019 16:00
What is the sum of these mixed numbers 2 1/8 + 4 3/8
Answers: 1
question
Mathematics, 21.06.2019 16:20
The number of nails of a given length is normally distributed with a mean length of 5.00 in, and a standard deviation of 0.03 in. find the number of nails in a bag of 120 that are less than 4.94 in. long.
Answers: 3
question
Mathematics, 21.06.2019 16:50
The parabola y = x² - 4 opens: a.) up b.) down c.) right d.) left
Answers: 1
You know the right answer?
One road crew can pave a section of highway in 15 h. a second crew can do the same job in 10h. how l...
Questions
question
English, 19.04.2021 06:20
question
Chemistry, 19.04.2021 06:20
question
Biology, 19.04.2021 06:20
Questions on the website: 13722361