subject
Mathematics, 03.08.2019 22:00 cavapoo

Alandscaper estimates that a set of plants can be installed in 6 hours by 12 workers. the landscaper wants to finish a set of plants in 4 hours. assuming that the variables are inversely related, how many workers should the landscaper bring to the job? 8

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 12:30
Karianne and lucius are analyzing a linear function on a graph. karianne says that unit rate is equal to rate of change, but that slope is calculated differently. lucius says that unit rate, rate of change, and slope are calculated the same way. who is correct? explain your answer.
Answers: 1
question
Mathematics, 21.06.2019 12:30
The nature park has a pride of 5 adult lions and 3 cubs. the adults eat 8 pounds of meat each day and the cubs eat 4 pounds. how much meat do the cubs and lions eat?
Answers: 2
question
Mathematics, 21.06.2019 15:30
What is the probability of drawing three queens from a standard deck of cards, given that the first card drawn was a queen? assume that the cards are not replaced.
Answers: 2
question
Mathematics, 21.06.2019 20:00
Aconstruction worker has rope 9 m long he needs to cut it in pieces that are each 3 /5 m long how many such pieces can he cut without having any rope leftover?
Answers: 3
You know the right answer?
Alandscaper estimates that a set of plants can be installed in 6 hours by 12 workers. the landscaper...
Questions
question
Mathematics, 16.09.2019 05:10
question
Mathematics, 16.09.2019 05:10
question
Mathematics, 16.09.2019 05:10
question
Mathematics, 16.09.2019 05:10
Questions on the website: 13722367