Mathematics, 23.07.2019 09:00 bradydodson47
Pia printed two maps of a walking trail. the length of the trail on the first map is 8 cm. the length of the trail on the second map is 6 cm. (q. 1) 1 cm on the first map represents 2 km on the actual trail. what is the scale factor from the map to the actual trail? what is the length of the actual trail? (q. 2) a landmark on the first map is a triangle with side lengths of 3 mm, 4 mm, and 5 mm. what is the scale factor from the first map to the second map? what are the side lengths of the landmark on the second map? show your work.
Answers: 1
Mathematics, 21.06.2019 21:30
Using pert, adam munson was able to determine that the expected project completion time for the construction of a pleasure yacht is 21 months, and the project variance is 4. a) what is the probability that the project will be completed in 17 months? b) what is the probability that the project will be completed in 20 months? c) what is the probability that the project will be completed in 23 months? d) what is the probability that the project will be completed in 25 months? e) what is the due date that yields a 95% chance of completion?
Answers: 3
Mathematics, 22.06.2019 01:00
Find the rate of change for the situation.you run 7 miles in one hour and 21 miles in three hours.
Answers: 1
Mathematics, 22.06.2019 02:00
Aculinary club earns $1360 from a dinner service. they sold 45 adult meals and 80 student meals. an adult meal costs twice as much as a student meal. what is the cost of an adult meal?
Answers: 1
Mathematics, 22.06.2019 04:00
What is the answer to this equation? and if you can, find a way to show your work.
Answers: 2
Pia printed two maps of a walking trail. the length of the trail on the first map is 8 cm. the lengt...
English, 10.03.2021 23:30
English, 10.03.2021 23:30
Mathematics, 10.03.2021 23:30
Health, 10.03.2021 23:30
Mathematics, 10.03.2021 23:30
Mathematics, 10.03.2021 23:30
Mathematics, 10.03.2021 23:30
Biology, 10.03.2021 23:30