subject
Physics, 28.06.2019 19:00 williamsvilletiles

How much work must be done on a 20-kg go-cart to increase its speed from 5 m/s to 10 m/s? a. 750 j b. 250 j c. 100 j d. 1000 j

ansver
Answers: 1

Another question on Physics

question
Physics, 21.06.2019 19:30
Abody of weight 60 kg is standing in a lift the lift going upward with a uniform velocity of 4.9 metre per second slows down and stops in two seconds then apparent weight of the body during the slow down process is
Answers: 2
question
Physics, 22.06.2019 11:30
Water is siphoned from a large tank and discharges into the atmosphere through a 50-mm diameter tube. the end of the tube is b = 2.1 m below the tank bottom which is a = 7.4 m deep, and viscous effects are negligible. determine the maximum height h over which the water can be siphoned without cavitation occurring. atmospheric pressure is 101.4 kpa, and the water vapor pressure is 1.79 kpa (absolute)
Answers: 3
question
Physics, 23.06.2019 01:00
To practice problem-solving strategy 10.1 for energy conservation problems. a sled is being held at rest on a slope that makes an angle θ with the horizontal. after the sled is released, it slides a distance d1 down the slope and then covers the distance d2 along the horizontal terrain before stopping. find the coefficient of kinetic friction μk between the sled and the ground, assuming that it is constant throughout the trip.
Answers: 1
question
Physics, 23.06.2019 06:30
Acopper sheet has a volume of 100 cm³. if the density of copper is 8.9 g/cm³, what is the mass of the sheet? a. 11 g b. 8.9 g c. 189 g d. 890 g
Answers: 1
You know the right answer?
How much work must be done on a 20-kg go-cart to increase its speed from 5 m/s to 10 m/s? a. 750 j...
Questions
question
Chemistry, 02.05.2021 23:20
Questions on the website: 13722363