subject
Physics, 03.07.2019 04:20 leslieperez67

Electric power is to be generated by installing a hydraulic turbine generator at a site 120 m below the free surface of a large water reservoir that can supply water at a rate of 2400 kg/s steadily. determine the power generation potential.

ansver
Answers: 1

Another question on Physics

question
Physics, 22.06.2019 01:30
The speed of light in a material is 0.50 c. what is the critical angle of a light ray at the interface between the material and a vacuum?
Answers: 1
question
Physics, 22.06.2019 03:50
The intensity of a polarized electromagnetic wave is 12 w/m^2. part a) what will be the intensity after passing through a polarizing filter whose axis makes the angle θ=0∘ with the plane of polarization? part b) what will be the intensity after passing through a polarizing filter whose axis makes the angle θ=30∘ with the plane of polarization? part c) what will be the intensity after passing through a polarizing filter whose axis makes the angle θ=45∘ with the plane of polarization? part d) what will be the intensity after passing through a polarizing filter whose axis makes the angle θ=60∘ with the plane of polarization? part e) what will be the intensity after passing through a polarizing filter whose axis makes the angle θ=90∘ with the plane of polarization?
Answers: 1
question
Physics, 22.06.2019 12:30
Uppose we consider the system of the three capacitors as a single "equivalent" capacitor. given the charges of the three individual capacitors calculated in the previous part, find the total charge qtot for this equivalent capacitor. express your answer in terms of v and c.
Answers: 2
question
Physics, 22.06.2019 13:20
Arrange the images in order to show how lake-effect snow occurs.
Answers: 2
You know the right answer?
Electric power is to be generated by installing a hydraulic turbine generator at a site 120 m below...
Questions
question
Biology, 11.10.2019 05:20
question
Mathematics, 11.10.2019 05:20
Questions on the website: 13722362