subject
Physics, 16.07.2019 01:40 kenzierosa

Two highways connect an origin-destination pair, having performance functions of t1 = 5 + 4(x1/c1) and t2 = 4 + 5(x2/c2) for routes 1 and 2, respectively. for the performance functions, the t's are in minutes and the flows (x's) and capacities (c's) are in thousands of vehicles per hour. the total traffic demand for the two highways is 4000 vehicles during the peak hour. initially, the capacities of routes 1 and 2 are 3500 veh/h and 4600 veh/h, respectively. a construction project is planned that will cut the capacity of route 2 by 2100 veh/g. how much additional vehicle-hours of travel time will be added to the system assuming user-equalibrium conditions hold?

ansver
Answers: 2

Another question on Physics

question
Physics, 21.06.2019 21:00
Mike walks 100 meter north, then walks 30 meters south. after this, he walks another 10 meters north. what is the magnitude of his total displacement during this walk,in meters?
Answers: 2
question
Physics, 22.06.2019 00:30
Which type of wave can travel without a medium
Answers: 1
question
Physics, 22.06.2019 04:00
Determine the maximum r-value of the polar equation r =3+3 cos 0
Answers: 3
question
Physics, 22.06.2019 07:00
Why should seat belts not be mandatory quick plz
Answers: 2
You know the right answer?
Two highways connect an origin-destination pair, having performance functions of t1 = 5 + 4(x1/c1) a...
Questions
question
Mathematics, 21.04.2020 15:25
Questions on the website: 13722367