An assembly line with 17 tasks is to be balanced. the longest task is 2.4 minutes, and the total time for all tasks is 18 minutes. the line will operate for 450 minutes per day. a. what are the minimum and maximum cycle times? b. what range of output is theoretically possible for the line? c. what is the minimum number of work stations needed if the maximum output rate is to be sought? d. what cycle time will provide an output rate of 125 units per day? e. what output potential will result if the cycle time is (1) 9 minutes? (2) 15 minutes?

ansver
Answers: 2

Another question on Physics

question
Physics, 22.06.2019 00:10
The summit of chimborazo, in ecuador, which is at a distance of about 6,384 km from the earth’s center. the bottom of the mariana trench, in the western pacific ocean, which is nearly 6,370 km from the center of the earth. on the surface of earth on the equator line.
Answers: 2
question
Physics, 22.06.2019 06:30
The energy of a photon was found to be 3.38 × 10–19 j. planck’s constant is 6.63 × 10–34 j • s. which color of light corresponds to this photon?
Answers: 2
question
Physics, 22.06.2019 09:30
Suppose you increase your walking speed from 7 m/s to 13 m/s in a period of 2 s. what is your acceleration?
Answers: 2
question
Physics, 22.06.2019 15:50
Select all the correct answers. which changes will increase the rate of reaction during combustion? decreasing the area of contact between the reactants adding more oxygen to the reaction removing heat from the reaction changing the reactants from solid form to powdered form lowering the exposure of the reactants to air
Answers: 3
You know the right answer?
An assembly line with 17 tasks is to be balanced. the longest task is 2.4 minutes, and the total tim...
Questions
Questions on the website: 13722360