subject
Physics, 08.08.2019 00:10 sharonsmailbagot6uas

In thick materials, the charge carrying particles can move easily.
a. not enough info
b. the same amount
c. less
d. more

ansver
Answers: 2

Another question on Physics

question
Physics, 22.06.2019 01:30
For problems 1-3, consider a simple dc brush motor with a permanent magnet stator. with an an consider a simple dc brush motor with a permanent magnet ae supply voltage of 100 v, the no-load speed of the motor is 1000 rpm. this motor can provide a torque of 1.9 n-m at 800 rpm drawing a current of 2 a current are both zero at no load.) 1. with an armature supply voltage of 100 v, the motor is operated at 900 rpm. what is the motor torque? what is the mechanical power delivered by the motor? what is the current draw? what is the electrical power input? what is the energy efficiency of the motor? with an armature supply voltage of 100 v, the motor is operated at 1100 rpm (where it acts as a generator). what torque input is required? what mechanical power is required what current is generated? what is the electrical power generated? what is the energy efficiency of the motor acting as a generator? 2. with an armature supply voltage raised to 120 v, the motor is operated at 1000 rpm. what is the no-load speed? what is the motor torque? what is the mechanical power delivered by the motor? what is the current draw? what is the electrical power input what is the energy efficiency of the motor? 3.
Answers: 3
question
Physics, 22.06.2019 11:00
Aperson walks first at a constant speed of 4.89 m/s along a straight line from point a to point b and then back along the line from b to a at a constant speed of 2.95 m/s. what is the average speed over the entire trip?
Answers: 1
question
Physics, 22.06.2019 13:10
1. the materials manager for a billiard ball maker must periodically place orders for resin, one of the raw materials used in producing billiard balls. she knows that manufacturing uses resin at a rate of 50 kilograms each day, and that it costs $.04 per day to carry a kilogram of resin in inventory. she also knows that the order costs for resin are $100 per order, and that the lead time for delivery is four (4) days.2. at what point should resin be reordered? a. 0 kilograms remainingb. 50 kilograms remainingc. 200 kilograms remainingd. 400 kilograms remaininge. 500 kilograms remaining3. if order size was 1,000 kilograms of resin, what would be the length of an order cycle? a. 0.05 daysb. 4 daysc. 16 daysd. 20 dayse. 50 days4. if the order size was 1,000 kilograms of resin, what would be the average inventory level? a. 50 kilogramsb. 200 kilogramsc. 500 kilogramsd. 800 kilogramse. 1,000 kilograms5. if the order size was 1,000 kilograms of resin, what would be the daily total inventory costs, excluding the cost of the resin? a. $5b. $10c. $20d. $25e. $40
Answers: 3
question
Physics, 23.06.2019 03:50
Which stable element is used to determine the age of volcanic rock? a- argon b- carbon-14 c- potassium d- carbon-12
Answers: 2
You know the right answer?
In thick materials, the charge carrying particles can move easily.
a. not enough info
b...
Questions
question
Mathematics, 04.12.2020 22:50
question
Mathematics, 04.12.2020 22:50
question
Mathematics, 04.12.2020 22:50
question
English, 04.12.2020 22:50
question
Mathematics, 04.12.2020 22:50
Questions on the website: 13722363