using the same cost and time estimates, consider the
time-effectiveness of each engineer.
cost per
time to
complete job
camilla $40 20 hours
john
30 hours
nora
40 hours
oracio
50 hours
if scitech is most concerned about meeting a deadline
regardless of the cost, which engineer should the
company choose?
camilla
john
nora
oracio
$20
$15

ansver
Answers: 1

Another question on Physics

question
Physics, 22.06.2019 06:30
Which features on mars point to the possibility of liquid water on the planet? impact craters with sharp rims volcanic cones with craters gullies and stream-like channels mountain ranges with faults
Answers: 1
question
Physics, 22.06.2019 16:00
Rank the six combinations of electric charges on the basis of the electric force acting on q1. define forces pointing to the right as positive and forces pointing to the left as negative. rank positive forces as larger than negative forces. q1,q2,q3 = positive(+) q1 = + q2 = + q3 = - q1 = + q2= - q3= + q1= - q2= + q3= + q1= + q2= - q3= - q1,q2,q3 = negative
Answers: 1
question
Physics, 23.06.2019 01:30
Which statements did both aristotle and ptolemy assume? check all that apply.
Answers: 1
question
Physics, 23.06.2019 01:30
Aplane's average speed between two cities is 600 km/h. if the trip takes 2.5 hours, how far does the plane fly?
Answers: 2
You know the right answer?
Icmiiuyildl design
assignment active
determining time-effectiveness
using the same...
Questions
question
Mathematics, 26.01.2021 05:40
question
Mathematics, 26.01.2021 05:40
question
Mathematics, 26.01.2021 05:40
question
Mathematics, 26.01.2021 05:40
question
Social Studies, 26.01.2021 05:40
Questions on the website: 13722361