subject
Physics, 05.10.2019 07:30 karlamiddleschool

The canadian oil sands industry has generated one billion (109) m3 of contaminated fine tailings. these tailings are a mixture of fine solid particles and water. the solids, which have an average specific gravity of 2.67, account for 32% of the weight of the tailings. (a) how much will it cost, in canadian dollars, to remediate all of the tailings. assume that it costs $1.5 us to remediate 1 ft3 (i. e. one cubic foot) of tailings, and that $1.00 can is worth $0.75 us a foot is 30.48 cm. (b) calculate the volume of solid particles (c) calculate the total mass of tailings

ansver
Answers: 3

Another question on Physics

question
Physics, 22.06.2019 06:20
Oxygen undergoes an isentropic expansion from 120 degree c and 280 kpa absolute to 140 kpa absolute. determine the final temperature of the oxygen and the amount of work per kg of o_2 produced in the process if it is adiabatic.
Answers: 1
question
Physics, 22.06.2019 17:30
Convection currents are caused by differences in what two things?
Answers: 1
question
Physics, 23.06.2019 02:00
Does the asteroid belt revolve around the sun?
Answers: 2
question
Physics, 23.06.2019 02:30
Five renewable energy resources are wind, sunlight, moving water and geothermal energy. question 2 options: true false
Answers: 2
You know the right answer?
The canadian oil sands industry has generated one billion (109) m3 of contaminated fine tailings. th...
Questions
question
Mathematics, 07.12.2020 03:30
question
Social Studies, 07.12.2020 03:30
Questions on the website: 13722360