subject
Physics, 06.10.2019 02:20 Happygirl5715

Calculate
3) i) mass of pile driver used to push the pile into the
ground - cam)
1) height of pile driver (2m)
m) pile material cam)
in shape at the based of the pile (2m)

a metal block with mass 50kg is being dropped onto a
ipile to build a tall building. the height of
metal block from the pile is 20m calculate
cm
i weight of metal block.
velodty of metal block just
770)
before it hits the pile
in
impulsive force acted on the pile if the time
impact is 50s.


Calculate3) i) mass of pile driver used to push the pile into theground - cam)1) h

ansver
Answers: 2

Another question on Physics

question
Physics, 22.06.2019 12:00
Asolid round steel rod 6.25 mm in diameter and 375 mm long is rigidly bonded to the end of solid square brass rod 25 mm on a side and 300 mm long. the geometric axes of the bare are along the same line. an axial tensile force of 5.4 kn is applied at the extreme ends of the assembly. for steel e = 200 gpa and for brass e = 90 gpa. determine the total elongation for the assembly.
Answers: 1
question
Physics, 22.06.2019 13:00
What causes the formation of ocean currents?
Answers: 2
question
Physics, 22.06.2019 17:50
Which of the following best describes internal energy? a. the difference between the kinetic and potential energies of the particles in a system b. the sum of the kinetic and potential energies of the particles in a system c. the sum of the kinetic and thermal energies of the particles in a system d. the difference between the kinetic and thermal energies of the particles in a system
Answers: 2
question
Physics, 23.06.2019 00:50
Which sentences describe point source pollution? in this type of pollution, the source of the pollution is single and easily identifiable. when runoff water from the melting of snow mixes with debris, it creates pollution. the runoff water, mixed with pollutants, reaches large areas with disastrous effects. alternatively, when a wastewater treatment plant releases harmful chemicals into a stream, the chemicals pollute the stream water because they are not treated for safety.
Answers: 2
You know the right answer?
Calculate
3) i) mass of pile driver used to push the pile into the
ground - cam)
1) h...
Questions
question
English, 13.11.2020 18:00
question
English, 13.11.2020 18:00
Questions on the website: 13722360