subject
Physics, 09.10.2019 06:00 brandonleekenyon

Abag of cement originally weighing 134 lb was lifted at a constant rate. as it rose, cement also leaked out at a constant rate. by the time the bag had been lifted to 15 ft, 12 of the cement had leaked out. how much work was done lifting the cement this far? (neglect the weight of the bag and lifting equipment.)

ansver
Answers: 3

Another question on Physics

question
Physics, 22.06.2019 13:30
Global warming will produce rising sea levels partly due to melting ice caps but also due to the expansion of water as average ocean temperatures rise. to get some idea of the size of this effect, calculate the change in length of a column of water 1.00 km high for a temperature increase of 1.00ºc. note that this calculation is only approximate because ocean warming is not uniform with depth. (answer in ×10^{-3} −3 m)
Answers: 1
question
Physics, 22.06.2019 16:00
A( developed during the process of technology design
Answers: 3
question
Physics, 22.06.2019 20:00
Awave has a wavelength of 7 mm and a frequency of 19 hertz. what is its speed?
Answers: 1
question
Physics, 22.06.2019 23:00
Which of the following will cause an induced current in a coil of wire? the constant field of the earth passing through the coil a magnet resting near the coil a magnet being moved into or out of the coil a wire carrying a constant current near the coil
Answers: 3
You know the right answer?
Abag of cement originally weighing 134 lb was lifted at a constant rate. as it rose, cement also lea...
Questions
question
Computers and Technology, 24.08.2019 16:30
question
Mathematics, 24.08.2019 16:30
question
Mathematics, 24.08.2019 16:30
question
Mathematics, 24.08.2019 16:30
Questions on the website: 13722367