Molten metal is poured into the pouring cup of a sand mold at a steady rate of 400 cm3/s. the molten metal overflows from the pouring cup and flows into the downsprue. the cross section of the sprue is round, with a diameter at the top = 3.4 cm. if the sprue is 20 cm long, determine the proper diameter at its base so as to maintain the same volume flow rate.
Answers: 1
Physics, 22.06.2019 14:20
How many atoms of nitrogen are in the chemical formula ni(w on
Answers: 1
Physics, 23.06.2019 01:00
To practice problem-solving strategy 10.1 for energy conservation problems. a sled is being held at rest on a slope that makes an angle θ with the horizontal. after the sled is released, it slides a distance d1 down the slope and then covers the distance d2 along the horizontal terrain before stopping. find the coefficient of kinetic friction μk between the sled and the ground, assuming that it is constant throughout the trip.
Answers: 1
Physics, 23.06.2019 02:00
How many electrons does each element require in its valence shell to become stable?
Answers: 1
Molten metal is poured into the pouring cup of a sand mold at a steady rate of 400 cm3/s. the molten...
Chemistry, 27.09.2019 02:30
Social Studies, 27.09.2019 02:30
Social Studies, 27.09.2019 02:30
Mathematics, 27.09.2019 02:30
Business, 27.09.2019 02:30
Mathematics, 27.09.2019 02:30
Geography, 27.09.2019 02:30
Geography, 27.09.2019 02:30
Chemistry, 27.09.2019 02:30
English, 27.09.2019 02:30
English, 27.09.2019 02:30
Biology, 27.09.2019 02:30
History, 27.09.2019 02:30
Arts, 27.09.2019 02:30
Computers and Technology, 27.09.2019 02:30