subject
Physics, 02.11.2019 04:31 ctomo2004

At a dock, a crane lifts a 2009 kg container 20 m, swings it out over the deck of a freighter, and lowers the container into the hold of the freighter, which is 8 m below the level of the dock. the acceleration of gravity is 9.81 m/s 2 . neglect friction losses. how much work is done by the crane on the container? answer in units of kj

ansver
Answers: 3

Another question on Physics

question
Physics, 22.06.2019 06:10
Which transition by an electron will release the greatest amount of energy? oa ob oc od
Answers: 2
question
Physics, 22.06.2019 06:30
Work = force × a. work b. energy c. distance d. momentum
Answers: 1
question
Physics, 22.06.2019 06:40
How does the kinetic energy of a charge change as the charge moves under the effect of an electric field from higher potential to lower potential? a.the kinetic energy increases.b.the kinetic energy decreases.c.the kinetic energy remains the same.d.the kinetic energy is always zero.
Answers: 1
question
Physics, 22.06.2019 15:50
If the work required to stretch a spring 3 ft beyond its natural length is 15 ft-lb, how much work is needed to stretch it 27 in. beyond its natural length?
Answers: 1
You know the right answer?
At a dock, a crane lifts a 2009 kg container 20 m, swings it out over the deck of a freighter, and l...
Questions
question
Mathematics, 25.06.2019 13:00
question
Mathematics, 25.06.2019 13:00
Questions on the website: 13722359