subject
Physics, 04.11.2019 19:31 teescub812

3) a 900n mountain climber scales a 100m cliff. how much work is done by the mountain climber?

ansver
Answers: 1

Another question on Physics

question
Physics, 21.06.2019 21:30
Apendulum has a mass of 1.5 kg and starts at a height of 0.4 m. if it is released from rest, how fast is it going when it reaches the lowest point of its path? acceleration due to gravity is g = 9.8 m/s2. a. 2.8 m/s b. 0 m/s c. 5.9 m/s d. 4.3 m/s
Answers: 1
question
Physics, 22.06.2019 01:00
Avehicle has an oil leak that is causing the entire oil pan to be wet, but inspection reveals no exact source after cleaning off the oil residue. technician a says to install a fluorescent dye in the crankcase and operate the engine, then re-inspect for leaks with a special light (black light). technician b says the oil leak may be coming from a source at the top of the engine, such as a valve cover gasket. who is correct?
Answers: 1
question
Physics, 22.06.2019 03:00
An equinox occurs when a. neither end of earth's axis is tilted toward or away from the sun. b. the north end of earth's axis is tilted away from the sun. c. the north end of earth's axis is tilted toward the sun. d. earth's axis is parallel to the sun's rays. select the best answer from the choices provided a b c d
Answers: 1
question
Physics, 22.06.2019 09:00
Asystematic approach to problem solving is called a (an)
Answers: 1
You know the right answer?
3) a 900n mountain climber scales a 100m cliff. how much work is done by the mountain climber?...
Questions
question
Mathematics, 13.11.2020 20:40
question
Mathematics, 13.11.2020 20:40
question
Mathematics, 13.11.2020 20:40
question
Mathematics, 13.11.2020 20:40
question
Mathematics, 13.11.2020 20:40
question
History, 13.11.2020 20:40
Questions on the website: 13722367