subject
Physics, 18.11.2019 23:31 trintrin227

Folded limestones that are exposed high elevations in the himalayas were originally deposited as sediments in a a. deep ocean trench along the southern margin of india. b. marine basin between india and eurasia. c. cenozoic fault basin between africa and arabia. d. late paleozoic syncline north of the tibetan plateau.

ansver
Answers: 2

Another question on Physics

question
Physics, 22.06.2019 01:30
The transfer of heat through the movement of a gas or liquid a. convection b. conduction c. radiation
Answers: 2
question
Physics, 22.06.2019 07:30
Some material consisting of a collection of microscopic objects is kept at a high temperature. a photon detector capable of detecting photon energies from infrared through ultraviolet observes photons emitted with energies of 0.3 ev, 0.5 ev, 0.8 ev, 2.0ev, 2.5ev, and 2.8ev. these are the only photon energies observed. (a) draw and label a possible energy-level diagram for one of the microscopic objects, which has four bound states. on the diagram, indicate the transitions corresponding to the emitted photons. explain briefly. (b) would a spring–mass model be a good model for these microscopic objects? why or why not? (c) the material is now cooled down to a very low temperature, and the photon detector stops detecting photon emissions. next, a beam of light with a continuous range of energies from infrared through ultraviolet shines on the material, and the photon detector observes the beam of light after it passes through the material. what photon energies in this beam of light are observed to be significantly reduced in intensity (“dark absorption lines”)? explain briefly.
Answers: 3
question
Physics, 22.06.2019 19:50
Aleaky 10-kg bucket is lifted from the ground to a height of 15 m at a constant speed with a rope that weighs 0.7 kg/m. initially the bucket contains 45 kg of water, but the water leaks at a constant rate and finishes draining just as the bucket reaches the 15-m level. find the work done. (use 9.8 m/s2 for g.) show how to approximate the required work by a riemann sum. (let x be the height in meters above the ground. enter xi* as xi.) lim n → ∞ n (9.8)(45−3 xi) i = 1 δx express the work as an integral. 0 dx evaluate the integral. (round your answer to the nearest integer.) j
Answers: 3
question
Physics, 23.06.2019 02:50
Adielectric-filled parallel-plate capacitor has plate area a = 30.0 cm2 , plate separation d = 9.00 mm and dielectric constant k = 3.00. the capacitor is connected to a battery that creates a constant voltage v = 15.0 v . throughout the problem, use ϵ0 = 8.85x10-12 c2/n.m2 . find the energy u1 of the dielectric-filled capacitor.
Answers: 2
You know the right answer?
Folded limestones that are exposed high elevations in the himalayas were originally deposited as sed...
Questions
question
Mathematics, 14.11.2021 23:30
question
Mathematics, 14.11.2021 23:30
question
Mathematics, 14.11.2021 23:30
question
Physics, 14.11.2021 23:30
question
Physics, 14.11.2021 23:30
question
Spanish, 14.11.2021 23:30
question
English, 14.11.2021 23:30
Questions on the website: 13722363