subject
Physics, 28.11.2019 06:31 16dshah

Apulley system is used to lift a 2,000 newton engine up a distance of 3 meters. the operator must apply a force of 250 newtons to the chain of the pulley system to lift the motor. to lift the engine 3 meters, the operator must pull a total of 30 meters of chain through the pulley system. what is the value of do?

ansver
Answers: 1

Another question on Physics

question
Physics, 21.06.2019 19:30
Abody of weight 60 kg is standing in a lift the lift going upward with a uniform velocity of 4.9 metre per second slows down and stops in two seconds then apparent weight of the body during the slow down process is
Answers: 2
question
Physics, 21.06.2019 22:30
According to the tide table below what time of day will the highest tide occur?
Answers: 1
question
Physics, 22.06.2019 11:10
Which situation will produce the greatest change of momentum
Answers: 2
question
Physics, 22.06.2019 15:30
Aforce of 100 newtons is used to move an object a distance of 15 meters with a power of 50 watts. find the work dine and the time it takes to do the work
Answers: 1
You know the right answer?
Apulley system is used to lift a 2,000 newton engine up a distance of 3 meters. the operator must ap...
Questions
question
English, 19.11.2020 05:50
Questions on the website: 13722361