subject
Physics, 29.11.2019 00:31 mirmir62

Hoover dam on the colorado river is the highest dam in the united states at 221m, with a power output of 680 mw. the dam generates electricity by flowing water down to a point 150 m below the stop, at an average flow rate of 650 m3/s.
part (a) calculate the power in this flow in watts.

ansver
Answers: 3

Another question on Physics

question
Physics, 21.06.2019 22:00
1. consider the case in which air fills air shocks on a truck trailer. the pressure in the shocks is 2 mpa. the temperature is 300 k. the diameter of the shock piston is 10 cm and the initial length of the cylindrical cavity containing the compressed air is 40 cm. a. the truck is gradually loaded over a period of a day in a static setting. the temperature is held constant for the atmosphere and thus for the gas shock. calculate the compressibility of the air in the shock for this condition when the truck is initially being loaded. b. if the shocks were loaded in a dynamic setting by driving over bumps, what would be the compressibility? state your assumption. c. what is the initial load on the shock if the shock is in an atmospheric 100 kpa? d. if the shock is compressed using the process described in part a, and the air shock compressed air cavity length decreases to 20 cm, what is the additional load applied to the shock?
Answers: 2
question
Physics, 22.06.2019 08:20
The bubba chump shrimp company processes and packages shrimp for sale to wholesale seafood distributors. the shrimp are transported to the main plant by trucks that carry 1,000 pounds (lb) of shrimp. once the continuous flow processing of the shrimp begins, no inventory is allowed in buffers due to spoilage and all of the shrimp must be processed within 12 hours to prevent spoilage. the processing begins at the sorter, where the trucks dump the shrimp onto a conveyor belt that feeds into the sorter, which can sort up to 500 lb per hour. the shrimp then proceed to the desheller, which can process shrimp at the rate of 400 lb per hour. however, after 3 hours and 45 minutes of processing, the desheller must be stopped for 15 minutes to clean out empty shrimp shells that have accumulated. the veins of the shrimp are then removed in the deveining area at a maximum rate of 360 lb per hour. the shrimp proceed to the washing area, where they are processed at 750 lb per hour. finally, the shrimp are packaged and frozen. what is the daily process capacity of the processing plant (excluding the packaging and freezing)?
Answers: 2
question
Physics, 22.06.2019 09:30
True or false graphs must include scales that increase by the same amount
Answers: 3
question
Physics, 22.06.2019 10:50
The temperature at a point (x, y) is t(x, y), measured in degrees celsius. a bug crawls so that its position after t seconds is given by x = 6 + t , y = 8 + 1 3 t, where x and y are measured in centimeters. the temperature function satisfies tx(3, 9) = 5 and ty(3, 9) = 4. how fast is the temperature rising on the bug's path after 3 seconds? (round your answer to two decimal places.)
Answers: 3
You know the right answer?
Hoover dam on the colorado river is the highest dam in the united states at 221m, with a power outpu...
Questions
question
Physics, 25.11.2020 22:10
question
Chemistry, 25.11.2020 22:10
question
Mathematics, 25.11.2020 22:10
question
Mathematics, 25.11.2020 22:10
question
Mathematics, 25.11.2020 22:10
Questions on the website: 13722361