subject
Physics, 28.12.2019 03:31 kenny909

In assigning a value for the most pessimistic (b) duration, the project manager should estimate the duration of the activity to have a 99% likelihood that it will take b or less amount of time.
a) true
b) false

ansver
Answers: 2

Another question on Physics

question
Physics, 22.06.2019 04:00
Acompound machine is also called a machine. a. force b. simple c. complex d. directional
Answers: 1
question
Physics, 22.06.2019 05:00
Which of the following is the result of the nuclear weak force? the instability of large nuclei the repelling force between positively charged protons the structure of the atom certain types of nuclear decay
Answers: 2
question
Physics, 22.06.2019 10:00
How many times did thomas edison mess up the light bulb
Answers: 1
question
Physics, 22.06.2019 10:00
Awater-filled u-tube manometer is used to measure the pressure inside a tank that contains air. the water level in the u-tube on the side that connects to the tank is 5 ft above the base of the tank. the water level in the other side of the u-tube (which is open to the atmosphere) is 2 ft above the base. determine the pressure within the tank.
Answers: 2
You know the right answer?
In assigning a value for the most pessimistic (b) duration, the project manager should estimate the...
Questions
question
Mathematics, 20.09.2019 06:10
question
Mathematics, 20.09.2019 06:10
question
Mathematics, 20.09.2019 06:10
Questions on the website: 13722363