subject
Physics, 27.02.2020 16:40 christiannpettyy

You are testing a new amusement park roller coaster with an empty car with a mass of 108kg. One part of the track is a vertical loop with a radius of 12.0m. At the bottom of the loop (pointA) the car has a speed of 25.0m/sand at the top of the loop (pointB) it has speed of 8.00m/s.

As the car rolls from point A to point B, how much work is done by friction?

ansver
Answers: 3

Another question on Physics

question
Physics, 21.06.2019 23:30
Edward tolman explained the results of his study by theorizing that the rats were learning about the maze during every trial but they a. were agitated because other groups were getting reinforcement b. could not remember how to demonstrate it without reinforcement c. were not motivated to demonstrate it without reinforcement d. seemed to be too lazy to actually work without reinforcement
Answers: 3
question
Physics, 22.06.2019 10:30
Aparticle moves in the xy plane with constant acceleration. at time zero, the particle is at x = 6 m, y = 8.5 m, and has velocity ~vo = (9 m/s) ˆı + (−2.5 m/s) ˆ . the acceleration is given by ~a = (4.5 m/s 2 ) ˆı + (3 m/s 2 ) ˆ . what is the x component of velocity after 3.5 s? answer in units of m/s.
Answers: 1
question
Physics, 22.06.2019 14:00
The mantle is made up of which structural zones?
Answers: 1
question
Physics, 22.06.2019 15:30
Aforce of 100 newtons is used to move an object a distance of 15 meters with a power of 50 watts. find the work dine and the time it takes to do the work
Answers: 1
You know the right answer?
You are testing a new amusement park roller coaster with an empty car with a mass of 108kg. One part...
Questions
question
Mathematics, 26.02.2022 14:00
Questions on the website: 13722367