Physics, 02.03.2020 23:55 Navi18

A construction crane lifts a prestressed concrete beam weighing 14 short tons from the ground to the top of piers that are 24 ft above the ground. Determine the amount of work done considering the beam. Take the value of g as 32.174 ft/s2.

ansver
Answers: 2

Another question on Physics

question
Physics, 22.06.2019 10:40
As you are trying to move a heavy box of mass m, you realize that it is too heavy for you to lift by yourself. there is no one around to , so you attach an ideal pulley to the box and a massless rope to the ceiling, which you wrap around the pulley. you pull up on the rope to lift the box. use g for the magnitude of the acceleration due to gravity and neglect friction forces. once you have pulled hard enough to start the box moving upward, what is the magnitude f of the upward force you must apply to the rope to start raising the box with constant velocity? express the magnitude of the force in terms of m, the mass of the box.
Answers: 1
question
Physics, 22.06.2019 23:10
Estimate of the number of stars in our galaxy
Answers: 1
question
Physics, 23.06.2019 02:30
Can a molecule have bond dipoles but not have a molecular dipole?
Answers: 2
question
Physics, 23.06.2019 03:10
You want to move a heavy box with mass 30.0 kg across a carpeted floor. you pull hard on one of the edges of the box at an angle 30∘ above the horizontal with a force of magnitude 240 n, causing the box to move horizontally. the force of friction between the moving box and the floor has magnitude 41.5 n . what is the box's acceleration just after it begins to move
Answers: 1
You know the right answer?
A construction crane lifts a prestressed concrete beam weighing 14 short tons from the ground to the...
Questions
question
Mathematics, 29.09.2019 08:30
question
Mathematics, 29.09.2019 08:30
question
Mathematics, 29.09.2019 08:30
Questions on the website: 13722361