subject
Physics, 07.03.2020 04:29 Fireburntbudder

In a shipping yard, a crane operator attaches a cable to a 1,090 kg shipping container and then uses the crane to lift the container vertically at a constant velocity for a distance of 32 m. Determine the amount of work done (in J) by each of the following.

a. the tension in the cable
b. the force of gravity

ansver
Answers: 3

Another question on Physics

question
Physics, 21.06.2019 23:30
In order for the bug to fly through the air a force has to push the bug forward. identify this force. how does the bug produce
Answers: 1
question
Physics, 22.06.2019 06:00
Why don't you see your reflection in water with waves or repples
Answers: 1
question
Physics, 22.06.2019 16:30
Acalorimeter uses the principle that thermal energy flows from hotter material to colder material until both reach the same
Answers: 1
question
Physics, 22.06.2019 18:20
An object dropped from cliff falls with a constant acceleration of 10 metre per second square find its speed of two seconds after it was dropped
Answers: 2
You know the right answer?
In a shipping yard, a crane operator attaches a cable to a 1,090 kg shipping container and then uses...
Questions
question
Mathematics, 28.07.2019 01:00
question
Social Studies, 28.07.2019 01:00
Questions on the website: 13722367