subject
Physics, 08.04.2020 16:19 hasshh

A project is located in an area with a demand-response program and on a site that has enough room for a wind-turbine to allow for on-site renewable energy. If the project implements both of these strategies, which of the following will occur?

A. The project's energy costs will decrease B. The project's renewable energy production will decrease C. The project's energy demands will decrease D. the project minimum energy performance will decrease

ansver
Answers: 3

Another question on Physics

question
Physics, 22.06.2019 00:30
Orange juice has a lower or higher viscosity than chocolate syrup
Answers: 2
question
Physics, 22.06.2019 10:30
The precision of a laboratory instrument is ± 0.05 g. the accepted value for your measurement is 7.92 g. which measurements are in the accepted range? check all that apply. 7.85 g 7.89 g 7.91 g 7.97 g 7.99 g
Answers: 1
question
Physics, 22.06.2019 11:20
Suppose a diode consists of a cylindrical cathode with a radius of 6.200×10^−2 cm , mounted coaxially within a cylindrical anode with a radius of 0.5580 cm . the potential difference between the anode and cathode is 260 v . an electron leaves the surface of the cathode with zero initial speed (v initial=0). find its speed vfinal when it strikes the anode.
Answers: 1
question
Physics, 22.06.2019 14:30
Will mark as brainliest how does a catapult increase the trajectory of an object? ps. answer as if u were a 5th grader
Answers: 1
You know the right answer?
A project is located in an area with a demand-response program and on a site that has enough room fo...
Questions
question
History, 24.02.2021 18:40
question
Mathematics, 24.02.2021 18:40
question
Mathematics, 24.02.2021 18:40
question
Mathematics, 24.02.2021 18:40
question
Mathematics, 24.02.2021 18:40
question
Mathematics, 24.02.2021 18:40
Questions on the website: 13722367