subject
Physics, 09.04.2020 17:08 ashleyzamarripa08

13. A crane lifts a load of steel that weighs 9500N a distance of 150 m It takes 5 minutes to complete the task How much work is done by the crane?

ansver
Answers: 3

Another question on Physics

question
Physics, 22.06.2019 12:40
Find the equation for the plane through upper p 0 left parenthesis negative 4 comma negative 8 comma negative 5 right parenthesis perpendicular to the following line. xequalsnegative 4 minus t, yequalsnegative 8 plus 2 t, zequals3 t, minusinfinityless thantless thaninfinity
Answers: 2
question
Physics, 22.06.2019 13:00
4. if you were an astronaut on the moon, what would you experience? what would you see from your perspective?
Answers: 1
question
Physics, 22.06.2019 21:30
The diagram shows a boulder rolling down a hill into a valley and then up the opposite hill. at which position does the boulder have the greatest kinetic energy? a b c d
Answers: 2
question
Physics, 23.06.2019 00:30
Madison lives near the ocean. she’s formed a hypothesis that increased concentrations of salt in the air speeds the corrosion of certain metals. if madison plans to test this hypothesis, she will have to deal with the following variables in her experiment: dependent variable: independent variable: one possible confounding variable:
Answers: 1
You know the right answer?
13. A crane lifts a load of steel that weighs 9500N a distance of 150 m It takes 5 minutes to comple...
Questions
question
World Languages, 06.07.2019 06:50
Questions on the website: 13722360