subject
Physics, 09.04.2020 19:59 staceymrtosr

A 30 kg bucket of water is lifted vertically (straight up) 3.0 m How much work was done on the
bucket during this movement?
10J
0903
O270J
882)

ansver
Answers: 1

Another question on Physics

question
Physics, 21.06.2019 23:30
Jessie ran 5000 meters from the cops and an average speed of 6 meters / second before he got caught . how long did he run?
Answers: 1
question
Physics, 22.06.2019 12:00
Ihave a density of 1.61g/cm^3 and a mass of 28g. find the missing value
Answers: 1
question
Physics, 22.06.2019 22:00
If a hiker that weighs 600 newtons climbs a 50 meter hill, how much gravitational potential energy has the hiker gained?
Answers: 1
question
Physics, 22.06.2019 23:20
Consider a production line with five stations. station 1 can produce a unit in 9 minutes. station 2 can produce a unit in 10 minutes. station 3 has two identical machines, each of which can process a unit in 12 minutes (each unit only needs to be processed on one of the two machines. station 4 can produce a unit in 5 minutes. station 5 can produce a unit in 8 minutes. which station is the bottleneck station?
Answers: 2
You know the right answer?
A 30 kg bucket of water is lifted vertically (straight up) 3.0 m How much work was done on the
...
Questions
question
Mathematics, 09.07.2019 05:00
Questions on the website: 13722362