subject
Physics, 14.04.2020 22:14 860jay

A 0.5 kg ball is thrown with an initial velocity of 18 m/s. How much
work is done on the football if it slowed down to a velocity of 9 m/s
when it was caught?

ansver
Answers: 1

Another question on Physics

question
Physics, 21.06.2019 23:30
Adding more pulleys to a system of pulleys needed to lift an object. a. increases the force b. decreases the force c. increases the amount of work d. decreases the amount of work
Answers: 1
question
Physics, 22.06.2019 06:10
Africtionless piston-cylinder contains 50 l of saturated liquid r-134a. the piston has a mass and an area resulting in an applied pressure of 500 kpa on the refrigerant. the refrigerant is now heated until its temperature rises to 70∘c. calculate the work (in kj) done during this process.
Answers: 3
question
Physics, 22.06.2019 12:00
Infrared radiation has wavelengths that are shorter than visible light is part of the visible light spectrum has wavelengths that are longer than visible light has the same wavelengths as ultraviolet radiation
Answers: 1
question
Physics, 22.06.2019 21:10
Aspecified volume of space contains an electric field for which the magnitude is given by e=e0cos(ωt). suppose that e0 = 20 v/m and ω = 1.0 × 107 s−1. part a what is the maximum displacement current through a 0.80 m2 cross-sectional area of this volume? express your answer with the appropriate units. idisp,max i d i s p , m a x = nothing nothing request answer part b how would this area have to be oriented relative to the electric field to get this maximum displacement current?
Answers: 2
You know the right answer?
A 0.5 kg ball is thrown with an initial velocity of 18 m/s. How much
work is done on the footb...
Questions
Questions on the website: 13722367