subject
Physics, 15.04.2020 05:18 lunamoon1

For some program, compiler A produces a program with a dynamic instruction count of 109 instructions and execution time of 1.1 seconds, while compiler B produces a program with a dynamic instruction count 1.2*109 and execution time of 1.5 seconds. Find an average CPI for each program given that the processor has a clock cycle time of 10-9 seconds. You must show the computations that lead to the answer.

ansver
Answers: 2

Another question on Physics

question
Physics, 22.06.2019 04:30
Acrow drops a 0.11kg clam onto a rocky beach from a height of 9.8m. what is the kinetic energy of the clam when it is 5.0m above the ground? what is its speed at that point?
Answers: 1
question
Physics, 22.06.2019 11:30
1. a camcorder has a power rating of 19 watts. if the output voltage from its battery is 7 volts, what current does it use?answer units 2. a 1.5m wire carries a 6 a current when a potential difference of 57 v is applied. what is the resistance of the wire? yourunits 3. a clothes dryer uses about 2 amps of current from a 240 volt line. how much power does it use? yourunits 4.
Answers: 1
question
Physics, 22.06.2019 14:50
Abar magnet cut in half will form a total ofpoles.a)fourb)eightc)two
Answers: 1
question
Physics, 22.06.2019 18:30
An object in mechanical equilibrium is an object
Answers: 2
You know the right answer?
For some program, compiler A produces a program with a dynamic instruction count of 109 instructions...
Questions
question
Mathematics, 08.04.2020 08:31
question
Mathematics, 08.04.2020 08:44
question
History, 08.04.2020 08:45
question
Social Studies, 08.04.2020 08:45
question
Chemistry, 08.04.2020 08:45
Questions on the website: 13722363