subject
Physics, 17.04.2020 01:09 adeleinflores9402

4.A 0.075 kg ball in a kinetic sculpture moves at a constant speed along a
motorized vertical conveyor belt. The ball rises 1.32 m above the ground.
A constant frictional force of 0.350 N acts in the direction opposite the
conveyor belt’s motion. What is the net work done on the ball?

ansver
Answers: 1

Another question on Physics

question
Physics, 22.06.2019 09:30
Astone is dropped from a cliff and falls 9.44 meters. what is the speed of the stone when it reaches the ground? a. 13.6 m/sec b. 1.39 m/sec c. 185 m/sec d. 9.80 m/sec
Answers: 3
question
Physics, 22.06.2019 17:30
Convection currents are caused by differences in what two things?
Answers: 1
question
Physics, 22.06.2019 22:00
It takes a lot of energy to get the temperature of water to increase and eventually boil because water has a high heat.
Answers: 1
question
Physics, 23.06.2019 04:00
Only 3% of the water on earth is usable by humans. even though that 3% is through the water cycle, we still need to be careful not to waste water.
Answers: 2
You know the right answer?
4.A 0.075 kg ball in a kinetic sculpture moves at a constant speed along a
motorized vertical...
Questions
question
Mathematics, 17.01.2020 13:31
question
English, 17.01.2020 13:31
question
Mathematics, 17.01.2020 13:31
question
Mathematics, 17.01.2020 13:31
question
Social Studies, 17.01.2020 13:31
Questions on the website: 13722361