subject
Physics, 21.04.2020 15:33 devaughnnorthcu8221

A leaky 10-kg bucket is lifted from the ground to a height of 13 m at a constant speed with a rope that weighs 0.8 kg/m. Initially the bucket contains 39 kg of water, but the water leaks at a constant rate and finishes draining just as the bucket reaches the 13-m level. Find the work done. (Use 9.8 m/s2 for g.) Show how to approximate the required work by a Riemann sum. (Let x be the height in meters above the ground. Enter xi* as xi.)

ansver
Answers: 2

Another question on Physics

question
Physics, 22.06.2019 01:30
The speed of light in a material is 0.50 c. what is the critical angle of a light ray at the interface between the material and a vacuum?
Answers: 1
question
Physics, 22.06.2019 02:20
Which changes of state do the labels represent? a: b: c:
Answers: 1
question
Physics, 22.06.2019 09:00
When a light bulb shines, it gives off light energy and energy. a. heat b. potential c. chemical d. electrical
Answers: 2
question
Physics, 22.06.2019 13:30
In a series circuit the __ is the same at every point
Answers: 2
You know the right answer?
A leaky 10-kg bucket is lifted from the ground to a height of 13 m at a constant speed with a rope t...
Questions
question
Mathematics, 17.10.2021 06:00
question
English, 17.10.2021 06:00
question
Spanish, 17.10.2021 06:00
question
Business, 17.10.2021 06:00
question
Mathematics, 17.10.2021 06:00
Questions on the website: 13722367