subject
Physics, 25.04.2020 04:02 kevo2024

A carpenter leaves several tools on the floor of his workshop when he goes for his lunch break. Sometime later the carpenter returns and sees that one of his coworkers has moved his tools to different shelves on a nearby bookshelf.
Which data would the carpenter need to collect to calculate the amount of work required to lift his tools onto the shelves?

(Choose the correct answers, there is more than one answer)

the height of each shelf

the time it took to move each tool

the amount of force needed to lift each tool

the strength of the person who moved the tools

ansver
Answers: 2

Another question on Physics

question
Physics, 21.06.2019 21:00
Apulley with a mechanical advantage of 5 will require you to pull times the amount of rope. a. 1/5 b. 5 c. 10 d. 15
Answers: 2
question
Physics, 21.06.2019 23:30
In which of the following cases is work being done on an object? question 2 options: pulling a trailer up a hill carrying a box down a corridor suspending a heavy weight with a strong chain pushing against a locked door
Answers: 2
question
Physics, 22.06.2019 09:30
Along the line connecting the two charges, at what distance from the charge q1 is the total electric field from the two charges zero? express your answer in terms of some or all of the variables s, q1, q2 and k =14ï€ïµ0. if your answer is difficult to enter, consider simplifying it, as it can be made relatively simple with some work.
Answers: 3
question
Physics, 22.06.2019 12:00
This is for my 8th grade science class, i really don’t understand. can someone me? , lol.
Answers: 1
You know the right answer?
A carpenter leaves several tools on the floor of his workshop when he goes for his lunch break. Some...
Questions
question
Engineering, 27.10.2020 21:50
question
Mathematics, 27.10.2020 21:50
question
Mathematics, 27.10.2020 21:50
question
Chemistry, 27.10.2020 21:50
Questions on the website: 13722367