subject
Physics, 30.05.2020 21:01 weeblordd

The diagram shows the scales used for recording temperatures. The labels for the scales are missing. 3 thermometers are oriented vertically labeled W, X, Y from left to right. The label Water Boils is connected by a dotted line to 212 degrees on W, 100 degrees on X, 373 degrees on Y. The label Water freezes is connected by a dotted line to 32 degrees on W, 0 degrees on W, 273 degrees on Y. The label Absolute Zero is connected by a dotted line to negative 460 degrees on W, negative 273 degrees on X, and 0 degrees on r Which labels complete the diagram? W: Fahrenheit X: Celsius Y: Kelvin W: Kelvin X: Celsius Y: Fahrenheit W: Celsius X:Fahrenheit Y: Kelvin W:Celsius X: Kelvin Y: Fahrenheit

ansver
Answers: 1

Another question on Physics

question
Physics, 21.06.2019 23:20
In the sport of parasailing, a person is attached to a rope being pulled by a boat while hanging from a parachute-like sail. a rider is towed at a constant speed by a rope that is at an angle of 15 ∘ from horizontal. the tension in the rope is 1900 n. the force of the sail on the rider is 30∘ from horizontal. what is the weight of the rider? express your answer with the appropriate units.
Answers: 1
question
Physics, 22.06.2019 08:20
The bubba chump shrimp company processes and packages shrimp for sale to wholesale seafood distributors. the shrimp are transported to the main plant by trucks that carry 1,000 pounds (lb) of shrimp. once the continuous flow processing of the shrimp begins, no inventory is allowed in buffers due to spoilage and all of the shrimp must be processed within 12 hours to prevent spoilage. the processing begins at the sorter, where the trucks dump the shrimp onto a conveyor belt that feeds into the sorter, which can sort up to 500 lb per hour. the shrimp then proceed to the desheller, which can process shrimp at the rate of 400 lb per hour. however, after 3 hours and 45 minutes of processing, the desheller must be stopped for 15 minutes to clean out empty shrimp shells that have accumulated. the veins of the shrimp are then removed in the deveining area at a maximum rate of 360 lb per hour. the shrimp proceed to the washing area, where they are processed at 750 lb per hour. finally, the shrimp are packaged and frozen. what is the daily process capacity of the processing plant (excluding the packaging and freezing)?
Answers: 2
question
Physics, 22.06.2019 09:30
Astone is dropped from a cliff and falls 9.44 meters. what is the speed of the stone when it reaches the ground? a. 13.6 m/sec b. 1.39 m/sec c. 185 m/sec d. 9.80 m/sec
Answers: 3
question
Physics, 22.06.2019 17:40
You throw a baseball directly upward at time =0 at an initial speed of 14.9 m/s. what is the maximum height the ball reaches above where it leaves your hand? ignore air resistance and take =9.80 m/s2.
Answers: 1
You know the right answer?
The diagram shows the scales used for recording temperatures. The labels for the scales are missing....
Questions
question
Mathematics, 21.02.2021 14:00
question
Mathematics, 21.02.2021 14:00
Questions on the website: 13722362