subject
Physics, 02.06.2020 17:59 sheyunicorn

An electricity-generating station needs to deliver 20 MW of power to a city 1.0 km away. A common voltage for commercial power generators is 22 kV, but a step-up transformer is used to boost the voltage to 230 kV before transmission.
(a) If the resistance of the wires is 2.0 ohms and the electricity costs about 10 cents/kWh, estimate what it costs the utility company to send the power to the city for one day?

ansver
Answers: 3

Another question on Physics

question
Physics, 22.06.2019 05:30
Agas expands from an initial volume of 0.040 m^3 and an initial pressure of 210 kpa to a final volume of 0.065 m^3 while its temperature is kept constant. how much work is done by the system?
Answers: 1
question
Physics, 22.06.2019 08:00
Who was the first scientist to measure speed as distance over time?
Answers: 1
question
Physics, 22.06.2019 12:30
Consider a system with two masses that are moving away from each other. why will the kinetic energy differ if the frame of reference is a stationary observer or one of the masses?
Answers: 1
question
Physics, 22.06.2019 13:50
Most of the volume of an atom is occupied by the
Answers: 1
You know the right answer?
An electricity-generating station needs to deliver 20 MW of power to a city 1.0 km away. A common vo...
Questions
question
Mathematics, 06.05.2020 06:36
question
Mathematics, 06.05.2020 06:36
Questions on the website: 13722363