subject
Physics, 15.07.2020 01:01 kayla2945

The cable of a crane is lifting a 950 kg girder. The girder increases its speed from 0.25 m/s to 0.75 m/sin a distance of 5.5m a) How much work is done by gravity?
b) How much work is done by tension?

ansver
Answers: 2

Another question on Physics

question
Physics, 21.06.2019 20:30
If forces acting on an object are unbalanced, which factors may result fron an unbalanced force? check all that apply
Answers: 1
question
Physics, 22.06.2019 05:20
Very large accelerations can injure the body, especially if they last for a considerable length of time. one model used to gauge the likelihood of injury is the severity index ( ), defined as =/ . in the expression, is the duration of the accleration, but is not equal to the acceleration. rather, is a dimensionless constant that = the number of multiples of that the acceleration is equal to.in one set of studies of rear-end collisions, a person's velocity increases by 13.7 km/h with an acceleration of 36.0 m/s2 . let the + direction point in the direction the car is traveling. what is the severity index for the collision?
Answers: 1
question
Physics, 22.06.2019 22:00
Notice how they put future which of the clouds shown would indicate a possible future rain storm? a) b) c) d)
Answers: 1
question
Physics, 23.06.2019 01:30
Which statements did both aristotle and ptolemy assume? check all that apply.
Answers: 1
You know the right answer?
The cable of a crane is lifting a 950 kg girder. The girder increases its speed from 0.25 m/s to 0.7...
Questions
Questions on the website: 13722363