A force of 450 newtons was necessary to lift a cement block. A total of 250 joules of work was done. How far was the cement block lifted?

ansver
Answers: 1

Another question on Physics

question
Physics, 21.06.2019 16:00
Suppose you use a machine that gives you a mechanical advantage of 2 to achieve an output force of 30newtons what must the input force be
Answers: 3
question
Physics, 21.06.2019 23:20
In the sport of parasailing, a person is attached to a rope being pulled by a boat while hanging from a parachute-like sail. a rider is towed at a constant speed by a rope that is at an angle of 15 ∘ from horizontal. the tension in the rope is 1900 n. the force of the sail on the rider is 30∘ from horizontal. what is the weight of the rider? express your answer with the appropriate units.
Answers: 1
question
Physics, 22.06.2019 03:40
Aprojectile is launched from ground level with an initial velocity of v 0 feet per second. neglecting air resistance, its height in feet t seconds after launch is given by s equals negative 16 t squared plus v 0 t. find the time(s) that the projectile will (a) reach a height of 192 ft and (b) return to the ground when v 0equals112 feet per second. (a) find the time(s) that the projectile will reach a height of 192 ft when v 0equals112 feet per second. select the correct choice below and, if necessary, fill in the answer box to complete your choice.
Answers: 1
question
Physics, 22.06.2019 14:20
The energy released by a nuclear fusion reaction is produced when
Answers: 1
You know the right answer?
A force of 450 newtons was necessary to lift a cement block. A total of 250 joules of work was done....
Questions
question
English, 07.07.2019 21:30
question
Mathematics, 07.07.2019 21:30
question
Mathematics, 07.07.2019 21:30
Questions on the website: 13722363