subject
Physics, 14.10.2020 21:01 deeyoung92

Problem #2: An apple is thrown upward with an initial velocity of +24.0 m/s. a. Sketch the apple’s trip and label what you know.

b. How high will the apple go? (Ans: +29.4 m)

c. What is the total time needed for the apple to return to its original position? (Ans: 4.90 s)

ansver
Answers: 3

Another question on Physics

question
Physics, 21.06.2019 17:40
Which is not a source of noise pollution? a)airplanes b)acid rain c)machines d)cars
Answers: 2
question
Physics, 21.06.2019 18:10
An insurance company wants to know if the average speed at which men drive cars is higher than that of women drivers. the company took a random sample of 27 cars driven by men on a highway and found the mean speed to be 72 miles per hour with a standard deviation of 2.2 miles per hour. another sample of 18 cars driven by women on the same highway gave a mean speed of 68 miles per hour with a standard deviation of 2.5 miles per hour. assume that the speeds at which all men and all women drive cars on this highway are both approximately normally distributed with unknown and unequal population standard deviations.
Answers: 2
question
Physics, 21.06.2019 21:00
What can be found in every skeletal muscle? a. nerves, bones, cartilage, and connective tissue b. tendons, cartilage, nerves, and blood vessels c. muscle fibers, nerves, connective tissue, and blood vessels d. tendons, nerves, blood vessels, and bones
Answers: 1
question
Physics, 22.06.2019 08:20
The bubba chump shrimp company processes and packages shrimp for sale to wholesale seafood distributors. the shrimp are transported to the main plant by trucks that carry 1,000 pounds (lb) of shrimp. once the continuous flow processing of the shrimp begins, no inventory is allowed in buffers due to spoilage and all of the shrimp must be processed within 12 hours to prevent spoilage. the processing begins at the sorter, where the trucks dump the shrimp onto a conveyor belt that feeds into the sorter, which can sort up to 500 lb per hour. the shrimp then proceed to the desheller, which can process shrimp at the rate of 400 lb per hour. however, after 3 hours and 45 minutes of processing, the desheller must be stopped for 15 minutes to clean out empty shrimp shells that have accumulated. the veins of the shrimp are then removed in the deveining area at a maximum rate of 360 lb per hour. the shrimp proceed to the washing area, where they are processed at 750 lb per hour. finally, the shrimp are packaged and frozen. what is the daily process capacity of the processing plant (excluding the packaging and freezing)?
Answers: 2
You know the right answer?
Problem #2: An apple is thrown upward with an initial velocity of +24.0 m/s. a. Sketch the apple’s...
Questions
question
English, 22.01.2021 23:30
question
Mathematics, 22.01.2021 23:30
question
Mathematics, 22.01.2021 23:30
question
History, 22.01.2021 23:30
Questions on the website: 13722361