subject
Physics, 25.11.2020 14:00 bunnybuge4

A 35-N bucket of water is lifted vertically 3.0 m and then returned to its original position. How much work did gravity do on the bucket during this process? a. 180J
b. 90J
c. 45 J
d. 0 J
e. 900 J

ansver
Answers: 1

Another question on Physics

question
Physics, 21.06.2019 18:30
A6,600 kg train car moving at +2.0 m/s bumps into and locks together with one of mass 5,400kg moving at -3.0m/s. what is their final velocity? +0.50 m/s -1.0 m/s +2.5 m/s -0.25 m/s
Answers: 3
question
Physics, 22.06.2019 15:30
The radius of a sphere is increasing at a rate of 9 cm/ sec. find the radius of the sphere when the volume and the radius of the sphere are increasing at the same numerical rate.
Answers: 1
question
Physics, 22.06.2019 16:30
Atank has a shape of a cone with a radius at the top of 2 m and a height of 5 m. the tank also has a 1 m spout at the top of the tank. the tank is filled with water up to a height of 2 m. find the work needed to pump all the water out the top of the spout. (use 9.8 m/s2 for g and the fact that the density of water is 1000 kg/m3.)
Answers: 1
question
Physics, 22.06.2019 16:50
Which is an example of an exothermic process?
Answers: 2
You know the right answer?
A 35-N bucket of water is lifted vertically 3.0 m and then returned to its original position. How mu...
Questions
question
Mathematics, 11.06.2021 03:40
question
Mathematics, 11.06.2021 03:40
question
English, 11.06.2021 03:40
question
Mathematics, 11.06.2021 03:50
Questions on the website: 13722359