subject
Physics, 15.12.2020 19:20 lovevanna

A bulldozer uses a 500 N force to push a load of dirt 16 m to the worksite. How much work does the bulldozer perform A. 8000 J
B. 500 J
C. 3,700 J
D. 65,000 J

ansver
Answers: 1

Another question on Physics

question
Physics, 22.06.2019 10:00
How many times did thomas edison mess up the light bulb
Answers: 1
question
Physics, 22.06.2019 14:30
Which pair of quantities includes one quantity that increases as the other decreases during simple harmonic motion?
Answers: 1
question
Physics, 22.06.2019 19:30
A47.2 g block of copper whose temperature is 480 k is placed in an insulating box with a 91.8 g block of lead whose temperature is 200 k. (a) what is the equilibrium temperature of the two-block system? (b) what is the change in the internal energy of the two-block system between the initial state and the equilibrium state? (c) what is the change in the entropy of the two-block system? the heat capacities of copper and lead are 386 j/kg·k and 128 j/kg·k, respectively.
Answers: 1
question
Physics, 22.06.2019 21:00
What do the atoms of elements in the same group have in common? a. they have the same atomic numbers. b. they have the same average atomic masses. c. they have the same number of electron shells. d. they have the same number of electrons in their outermost shells.
Answers: 1
You know the right answer?
A bulldozer uses a 500 N force to push a load of dirt 16 m to the worksite. How much work does the b...
Questions
Questions on the website: 13722362